LAMELLAS
·
STEP D14 · 14 OF 24
14
Prepare motor blade
Prepare the dedicated PN-LM-501 motor blade — drive coupling on motor side.
SPECIFICATIONS
TIP
WATCH OUT
TOOLS
TIME
15 min
About step 14 of the Luxa Aperio 500 Wall installation
Prepare motor blade · LAMELLAS · 24 step · Luxa Aperio 500 Wall (wall-mounted motorised pergola)
Prepare the dedicated PN-LM-501 motor blade — drive coupling on motor side.