FRAME · STEP D4 · 04 OF 24
04

Build the front U-frame on the ground

Build the front U-frame on the ground (two front pillars + front beam).

Build the front U-frame on the ground — illustration
Fig. 04 — Build the front U-frame on the ground

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      18 min

      About step 4 of the Luxa Aperio 500 Wall installation

      Build the front U-frame on the ground · FRAME · 24 step · Luxa Aperio 500 Wall (wall-mounted motorised pergola)

      Build the front U-frame on the ground (two front pillars + front beam).