Back to ponarc.com
FRAME · STEP D4 · 04 OF 16
04

Lift the two front pillars

Lift the two front PN-DZ-500 pillars onto their foot plate studs.

Lift the two front pillars — illustration
Fig. 04 — Lift the two front pillars

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      22 min

      About step 4 of the Luxa Sereno 500M Wall installation

      Lift the two front pillars · FRAME · 16 step · Luxa Sereno 500M Wall (wall-mounted manual bioclimatic pergola)

      Lift the two front PN-DZ-500 pillars onto their foot plate studs.

      Nearby steps in this installation