Back to ponarc.com
FRAME · STEP D6 · 06 OF 14
06

Prepare carrier fixing nuts

Pre-load PN-NT-080 channel nuts into all carrier-fixing positions.

Prepare carrier fixing nuts — illustration
Fig. 06 — Prepare carrier fixing nuts

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      12 min

      About step 6 of the Luxa Vetra installation

      Prepare carrier fixing nuts · FRAME · 14 step · Luxa Vetra (wall-mounted glass / polycarbonate veranda)

      Pre-load PN-NT-080 channel nuts into all carrier-fixing positions.

      Nearby steps in this installation