Lift the four pillars

Lift each PN-DZ-500 pillar onto its foot plate stud — two installers per pillar.

Lift the four pillars — illustration
Fig. 03 — Lift the four pillars

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      25 min

      About step 3 of the Luxa Sereno 500M installation

      Lift the four pillars · FRAME · 18 step · Luxa Sereno 500M (manual bioclimatic pergola)

      Lift each PN-DZ-500 pillar onto its foot plate stud — two installers per pillar.