FRAME
·
STEP D4 · 04 OF 18
04
Install rear carrier gutter
Install the rear PN-GU-500 carrier gutter — slope 1.5% toward the front.
SPECIFICATIONS
TIP
WATCH OUT
TOOLS
TIME
18 min
About step 4 of the Luxa Sereno 500M installation
Install rear carrier gutter · FRAME · 18 step · Luxa Sereno 500M (manual bioclimatic pergola)
Install the rear PN-GU-500 carrier gutter — slope 1.5% toward the front.