Back to ponarc.com
BLADES · STEP D10 · 10 OF 18
10

Install first blade

Install the first blade — verify free rotation and flush closed position.

Install first blade — illustration
Fig. 10 — Install first blade

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      15 min

      About step 10 of the Luxa Sereno 500M installation

      Install first blade · BLADES · 18 step · Luxa Sereno 500M (manual bioclimatic pergola)

      Install the first blade — verify free rotation and flush closed position.

      Nearby steps in this installation