BLADES
·
STEP D9 · 09 OF 18
09
Prepare louvre blades
Prepare the louvre blades — fit pivot pins, lay out on a clean covered surface.
SPECIFICATIONS
TIP
WATCH OUT
TOOLS
TIME
18 min
About step 9 of the Luxa Sereno 500M installation
Prepare louvre blades · BLADES · 18 step · Luxa Sereno 500M (manual bioclimatic pergola)
Prepare the louvre blades — fit pivot pins, lay out on a clean covered surface.