Back to ponarc.com
BLADES · STEP D8 · 08 OF 18
08

Install blade side rails

Slide PN-LR-500 blade side rails into the frame — pre-set pivot positions.

Install blade side rails — illustration
Fig. 08 — Install blade side rails

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      18 min

      About step 8 of the Luxa Sereno 500M installation

      Install blade side rails · BLADES · 18 step · Luxa Sereno 500M (manual bioclimatic pergola)

      Slide PN-LR-500 blade side rails into the frame — pre-set pivot positions.

      Nearby steps in this installation